Oh wow I was reading this wrong the whole time - so then the first number is the amount of Volts that are coming into the charge controller from the panels, and the second how much can be pushed to the batteries in Amps?
Since my battery system is going to be 24V, then I could technically get away with 1600 / 24 = 66 amp charge controller so something like the 150/80?